The radiators from the power car had been taken away and stripped down by volunteers. Then they had been taken away for pressure testing, recoring and repairs and then were re-assembled and painted.
Electrical wiring schemes are progressing and cab controls and further instruments are being stripped down and reconditioned - even to the extent of putting in new glass!